April 2021 Update

Completion of drop structure excavation and pouring of concrete base slab. Continued excavation of reservoir. Below is a time lapse video showing the process of tunneling the (2) 87.5″ diameter pipes underneath the railroad and Addison Creek from the reservoir excavation into the drop structure area.